Hennepin-dunwoody Bikeway Project

Posted
PROJECT GOALS
  • Build a two-way, multi-use trail on Dunwoody Boulevard and Hennepin Ave. The trail will run from Linden Avenue to the west of 17th St. The trail will be above the street grade. It will also protect users from vehicle traffic by a concrete barrier.
  •   Build one-way curb protected bicycle lanes on Hennepin Ave. between 17th to 12th Street. The lanes will replace existing painted on-street lanes and raise the lanes to the level of the sidewalk at intersections.
•  Make crossing improvements for pedestrian traffic along the whole street.
•   Slow turning motor vehicle traffic.
 
The project is located on Dunwoody Boulevard and Hennepin Avenue. It is between Linden Avenue and N 12th Street. It passes through the Lyndale Avenue intersection.
 
Construction will occur in 2024. The project is currently in the engagement and design phase. More at www.minneapolismn.gov/government/projects/hennepin-dunwoody-bikeway/  
 

Comments

No comments on this item Please log in to comment by clicking here